Phone: 1-509-493-1133
Hours: Mon-Fri 9am-5pm
White Salmon City Hall
100 N Main St.
White Salmon, WA 98672
The Port of Hood River has posted that bridge users should expect intermittent single-lane closures between the hours of 7 am and 5 pm every day throughout the testing period, with delays of approximately 30 minutes possible depending on traffic volume. Flaggers will direct traffic around the moving work zone.
Full bridge closures are anticipated to take place on October 13, 18, and 20 with delays of 30-45 minutes.
The Port of Hood River is conducting extensive live load testing on the bridge in response to the lowered load rating imposed by Oregon Department of Transportation in March of 2020.
For more information on this project, contact the Port of Hood River via email at porthr@gorge.net.