Phone: 1-509-493-1133
Hours: Mon-Fri 9am-5pm
White Salmon City Hall
100 N Main St.
White Salmon, WA 98672
Project Name: 2023 City-Wide Chip/Crack Sealing, Phase II
Contractor: Klickitat County Public Works Department
Description of Project: Road wear and cracks come in all shapes and sizes, and no pavement is immune to cracking. If left untreated, those cracks are only the start of more significant problems, from potholes all the way to sub-base failure. The city-wide chip sealing will start in July on a variety of roads that are in good, fair, and poor condition, as identified by the Washington State Transportation Improvement Board.
Chip Sealing Chip sealing is a thin film of heated asphalt liquid sprayed on the road surface, followed by the placement of small aggregate ("chips"). The chips are then compacted to orient the chips for maximum adherence to the asphalt, and excess stone is swept from the surface. This protects the pavement from the effects of sun and water, increases skid resistance, fills small cracks and other surface defects. Why is chip sealing done? A chip seal is about one fourth to one fifth the cost of a conventional asphalt overlay and extends the life of asphalt pavement by 5 to 7 years, which varies with the type and amount of daily traffic.
City Wide Chip Sealing Starts: July 18, 2023, at 6 AM
City Wide Chip Sealing Ends: July 20, 2023, at 5 PM
The City is requesting there be no parking on the following project locations during the project dates, including:
Northeast
NE Church St, Chip seal between NE Lincoln St and NE Hood St
NE Estes Ave, Chip Seal between NE Tohomish St to NE Washington St
NE Grandview Blvd, Chip seal between NE Pioneer Pl to NE O'Keefe Ave
NE Green Street, Chip seal between NE Estes Ave to NE Snohomish Ave
NE Hood Street, Chip seal between N Main Ave and NE Wauna Ave
NE Lincoln St, Chip seal between NE Church St to NE Estes Ave
NE Pioneer Place, Chip seal between Center Pl to NE Grandview Blvd
NE Scenic Ave, Chip seal between N Main Ave and NE Estes Ave
NE Skyline Drive, Chip seal between E Jewett Blvd and NE Rhine Village Drive
NE Snohomish Ave, Chip seal between NE Academy St to NE Green St
NE Spring Street, Chip seal from NE Estes Ave east to the end of the pavement
NE Wauna Ave, Chip seal between NE Hood St to NE Green St
Northwest
NW Academy Street, Chip seal NE Achor Ave to N Main Ave
NW Lincoln St, Chip seal from NW Garfield Ave west for approximately 500 ft
Southeast
SE 5th Street, Chip seal between SE Wyers St to SE Oak St
SE Oak Street, Chip seal between Dock Grade Rd to SE 7th St
Violators will be towed at the owner's expense per RCW 46.55.113(2i). Thank you for your attention to this matter.
City Contact: Andrew Dirks, City Public Works Director, 509-493-1133 x500